The Villerest dam, near the roannaise city, is located in the territory of the municipalities of Villerest and Commelle-Vernay. Its holdback extends over 770 ha, from Balbigny upstream to Villerest downstream. This book was carried out within the framework of the programme for the hydraulic development of the Loire Basin initiated in 1974 by the Comité de Bassin Loire-Bretagne. The essential function of this equipment is the capping of floods. It also participates in the support of low de la Loire to ensure the objective of 60 m 3/s in Gien (Loiret). Electricité de France, having obtained the concession of the fall, has set up a hydroelectric plant which ensures total energy production of 167 million kWh per year. Electrical production is a secondary function of this book.